top of page

Electrode cell design and construction

1.PNG

Continuous process small cylindrical anode cell and bottom cell installation

UP DOWN  TYPE (Hoist  Method) electrodeposition line
Installation of large-diameter anode cells and bottom cell

2.PNG
3.PNG

Large diameter side cell installation in continuous process
Installation of bottom cell and corrosion-resistant electrode

(T): +82) 031-484-4248

(F): +82) 031-484-4249

Room 1203, Jungang Officetel, 55, Gojan-ro, Danwon-gu, Ansan-si, Gyeonggi-do

©2021 by Kyungjin Engineering. Proudly created with Wix.com

bottom of page